GIS bushing - An Overview
Shear bolt connector For high voltage testing of the GIS or the cable, the cable is disconnected within the GIS by removing the conductor hyperlink or plug-involved. The GIS enclosure within the cable termination normally has an accessibility port. This port may also be useful for attaching a exam bushing.Speak to Shubhada Polymers now to discuss y